THE COMPLETE TOOLKIT
Per-line attribution is the core. The toolkit is what makes it operational — live activity, cost, trends, the menubar, the CLI. All of it ships in the box.
GET STARTED
Available on macOS, Windows, and Linux.
One-liner install
Detects Python, installs pipx, and points the CLI at this server.
Install pipx if you don't have it:
Install the CLI:
Set up in your repo:
REAL-TIME
Watch every AI session as it happens. Tokens, cost, current file, current model — streamed live to your browser via Server-Sent Events.
TERMINAL
No browser needed. Two commands cover the day-to-day: see what your AI is producing and who wrote each line.
iria-monitor attribution stats
$ iria-monitor attribution stats AI Code Statistics · last 30 days ───────────────────────────────── Total commits 342 AI-attributed 231 (67.5%) Lines added 12,847 by AI 8,621 (67.1%) by human 4,226 By agent claude-code 5,914 cursor 2,103 codex 604 Durability (30d) 88.4% Churn (7d) 6.2%
iria-monitor attribution blame src/auth.py
$ iria-monitor attribution blame src/auth.py 1 human import os 2 human import hmac 3 human from datetime import datetime 4 5 claude-code class AuthManager: 6 claude-code def __init__(self, db): 7 claude-code self.db = db 8 claude-code def create_token(self, uid): 9 claude-code return jwt.encode(...) 10 11 cursor def validate(self, tok): 12 cursor return jwt.decode(...)
CROSS-PLATFORM
A live AI % indicator in your system tray on macOS, Windows, and Linux. Click for today's tokens, cost, durability, and active session — without context-switching to a browser.